E-MAIL THIS LINK
To: 

Pentagon Official Calls for F-35 Production Slowdown
A top Pentagon official is calling for a production slowdown for the costly F-35 fighter jet after fatigue testing exposed potential cracks in the design.

"The analyzed hot spots that have arisen in the last 12 months or so in the program have surprised us at the amount of change and at the cost," he told AOL Defense, adding that the fatigue spots are tough to get at, meaning "the cost burden of that is what sucks the wind out of your lungs."

Posted by: GolfBravoUSMC 2011-12-02
http://www.rantburg.com/poparticle.php?ID=334513