E-MAIL THIS LINK
To: 

Let the cement flow and rebar support: SpaceX Boca Chica: Super Heavy BN1 Aft Dome Sleeved - Orbital Pad Receives Concrete
[YouTube] Concrete trucks arrive to continue the build up of the Orbital Launch Site. Meanwhile Super Heavy BN1's Aft Dome is sleeved in preparation for the booster's completion.
Posted by: 3dc 2021-02-10
http://www.rantburg.com/poparticle.php?ID=593825